Dumpster

 
 

      The Dumpster Project had some interesting aspects to it in that the bottom was completely rusted thru and the sides of the Dumpster were mushroomed out from slamming it down. I had to cut 8" from the bottom to try and straighten the sides back to where I could weld a new bottom and side re-inforcements.
 
 

 

    I had the local steel shop bend some 10ga.sheet steel for the bottom. I used 2" tube steel to straighten the sides so that I could line up the sheet steel to weld it. I used 2" x 2" x ¼" angle steel on the inside and outside to reinforce the existing metal. I used 2" x 1" x 1/8" channel steel on the outside bottom to keep the bottom from rusting out.